EN / ID
03 February 2022

ELNUSA Conducted First MWT in 2022 on O&M TAP Work Area That Traverses 7 Cities in South Sumatera

Jakarta, February 3, 2022 - The Board of Directors and Management of PT Elnusa Tbk (Elnusa) conducted Management Walkthrough (MWT) on the Operation & Maintenance (O&M) Talang Akar Pendopo (TAP) project that has been taking place since 2016, on (27/1) via online. The MWT aimed to demonstrate the commitment of the Management Team to all workers with the implementation of HSSE in the Elnusa environment.

The HSSE aspect is certainly essential for Elnusa clients. The project that is being run by Elnusa and taking place in the area of PT Pertamina Hulu Rokan (PHR) Regional 1 Zone 4 working area of Operation Field Pendopo and Field Adera. President Director of Elnusa, John Hisar Simamora in his direction conveyed, maintaining the quality of work and HSE by implementing the Golden Rules (Obedient, Intervention, Caring) and 15 Life Saving Rules. It is a guarantee to the client to produce work beyond the client's expectations.

"The use of technology in supporting the HSSE program will be done to monitor in any time and real-time, so that it can perform first aid and preventive action. Preventive measures are much better for reducing casualties, materially and even human." John said.

O&M TAP's operating area includes 7 regencies / cities in South Sumatra Province, including Musi Rawas Regency, Musi Banyuasin Regency, Pali Regency, Muara Enim Regency, Ogan Ilir Regency, Banyuasin Regency and Palembang City. O&M TAP's work is the service of operating work & maintenance of joint oil distribution facilities in the Talang Akar Pendopo (TAP) line, from East Musi Collection Station (SP) to Metering Station (SM) KM 3 Plaju, along 380M.

VP of Business Development, Hera Handayani mentioned that the performance of HSSE project was very good. Recorded Zero fatallity, safety performance has been excellent. The team has been very good at induction of Life Saving Rules." Reveals Hera.

In addition, Hera also ensured the vaccine status of the personnel on duty and appealed to immediately carry out booster vaccinations. Workers at the O&M TAP project are now 100% vaccinated. To that end, workers are currently preparing to follow the booster vaccine.

With good HSSE performance and always adherence to Elnusa Golden Rules and 15 Live Saving Rules, hopefully HSSE performance will increase.

Back to News